< Back To Homepage >


....
SuperShelf
Instructions
For bays up to 2.5 metres high
frame and bay
1
fit bottom beam
2
clip in second bottom beam
3
fit top beams
4
drop in shelf panel
5
                  6. THE SHELF CLIP. 2 clips to be fitted per beam (1 each end)  
    insert clip
a ) insert clip
      tap into position
b ) tap into position
   
bend over top of beam
c ) bend over top of beam
                    7. MODULAR CONTAINER (optional accessory)                  
      back beam to be fitted 2 slots higher than the front beam
a) back beam to be fitted 2 slots higher than the front beam
                                                     
                          dividers slot into position
c) dividers slot into position
            modular container overlap to fit
b) modular container overlap to fit
   
Frequently Asked Questions...
Do I need a bottom shelf?
YES! in nearly all cases this is required. If this causes a problem check with our sales office.
Do I need to fix the shelving to the floor or a wall?
This is recommended when the top loaded shelf (height) is equal to or greater than 4x the shelf depth (front to back).
Do I need to insert the beam clips?
YES! for the safety of your staff this is recommended.
Is there an upside and downside to the beam?
YES! the top side has a long groove.
What tools do Ineed to assemble the Supershelf?
Only a soft faced hammer and safety steps if the height exceeds 2 metres. We also recommend wearing gloves.
Do I need to stagger the beam heights when assembling modular containers?
YES! place the back beam 2 slots higher than the front beam

FS21019
Action Storage Systems Ltd
HELPLINE: 0800 592215
e-mail: sales@action-storage.co.uk