![]() |
Free Delivery Call us on Freephone |

TOOLS REQUIRED:
• Soft-faced hammer
• Safety steps (if the bay height exceeds 2 metres)
• We also recommend wearing gloves
Contents of Kit![]() |
A: 2 x End Frames B: Shelf Panels *Qty of shelf panels may vary dependant on width of bays C: 4 x Top Caps D & E: Hanging Beams and standard beams (the number of both hanging beams and standard beams depends on the height and type of garment hanging bay - see table below)
|
![]() |
Stand up first end frame. | ![]() |
Connect the two standard beams to the bottom of this first end frame (see the beam clip notes below for more detail). Note that the top side of the beam has a long groove |
||
![]() |
Stand up second end frame and connect the other ends of the two standard beams to it. | ![]() |
Connect 1 standard beam to the top of the unit at the back - leave the top front beam off for now (see the beam clip notes below for more detail). Go to step 5a, 5b, 5c or 5d depending on the height of your bay. |
![]() |
Go the step 6a, 6b, 6c or 6d depending on the height of your bay. | ||||||||
![]() |
|
![]() |
Connect the remaining standard beam to the top of the unit at the front (see the beam clip notes below for more detail). | ![]() |
Fit one of the panels on to the top beam level. | ||
![]() |
Fit one of the panels on to the bottom beam level. | ![]() |
Fit top caps Remember these units always require fixing to the wall or the floor (preferably both) with the correct fixings. |
Beam Clip
2 Clips to be fitted to each beam - 1 at each end
![]() Insert clip |
![]() Tap clip into position |
![]() Bend clip over top of beam |
REMEMBER
These units always require fixing to the wall or the floor (preferably to both) with the correct fixings.
![]() Wall fixing |
![]() Floor fixing |
![]() Hanging Beam |
![]() |
![]() |
![]() |
![]() |
![]() |